WPPI Energy
Registered Principal Details
Business Or Interest:
Municipal electric company organized under s. 66.073, Wis stats.
Lobbying Interests:
Development of legislation or administrative rules concerning renewable energy, air emissions, economic development, energy efficiency, facility sitting and utility industry regulation.
Title:
Senior Vice President
Municipal electric company organized under s. 66.073, Wis stats.
Lobbying Interests:
Development of legislation or administrative rules concerning renewable energy, air emissions, economic development, energy efficiency, facility sitting and utility industry regulation.
Title:
Senior Vice President
Contact
DE
Dan Ebert
1425 Corporate Center Dr
Sun Prairie, WI 53590
(608) 834-4500
(608) 837-0274
debert@wppienergy.org
http://www.wppienergy.org
1425 Corporate Center Dr
Sun Prairie, WI 53590
(608) 834-4500
(608) 837-0274
debert@wppienergy.org
http://www.wppienergy.org
Authorized Lobbyists
Lobbyist Name | Exclusive Duties | Authorized On | Withdrawn On |
---|
Lobbying Interests
Legislative Bills/Resolutions
Assembly Bill 145
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
Bill Text and History
5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
Bill Text and History
None
Notification Date5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 146
Relating to: use of renewable resource credits to comply with renewable portfolio standards.
Bill Text and History
5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: use of renewable resource credits to comply with renewable portfolio standards.
Bill Text and History
None
Notification Date5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 182
Relating to: assignment of income, prizes, and earnings to pay a municipal court judgment and prohibiting municipal electric or water utilities from collecting certain utility arrearages from owners of rental properties as property liens.
Bill Text and History
6/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: assignment of income, prizes, and earnings to pay a municipal court judgment and prohibiting municipal electric or water utilities from collecting certain utility arrearages from owners of rental properties as property liens.
Bill Text and History
Against
Notification Date6/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 309
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
Bill Text and History
10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
Bill Text and History
Other
Notification Date10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Against
Notification Date10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 527
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale mercha...
Bill Text and History
2/7/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale mercha...
Bill Text and History
For
Notification Date2/7/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 58
Relating to: liability of public utility customers for unbilled utility service.
Bill Text and History
5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: liability of public utility customers for unbilled utility service.
Bill Text and History
None
Notification Date5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Against
Notification Date5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 98
Relating to: requirements for wind energy systems, providing an exemption from emergency rule procedures, and granting rule-making authority.
Bill Text and History
5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: requirements for wind energy systems, providing an exemption from emergency rule procedures, and granting rule-making authority.
Bill Text and History
None
Notification Date5/24/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 102
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
Bill Text and History
10/18/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
Bill Text and History
Other
Notification Date10/18/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 216
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
Bill Text and History
10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
Bill Text and History
Other
Notification Date10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Against
Notification Date10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 428
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale mercha...
Bill Text and History
2011 Wisconsin Act 155
2/7/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale mercha...
Bill Text and History
2011 Wisconsin Act 155
For
Notification Date2/7/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Budget Bill Subjects
Biennial budget bill treatment of matter relating to
Public Service Commission
Public Service Commission
Notification Date
6/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
6/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Biennial budget bill treatment of matter relating to
Shared Revenue and Tax Relief
Shared Revenue and Tax Relief
Notification Date
6/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
6/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Topics Not Yet Assigned A Bill Or Rule Number
Development, drafting or introduction of a proposal relating to
relating to the siting of transmission lines
relating to the siting of transmission lines
Action Intended To Affect
Rule (by a state agency)
Notification Date
7/31/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Rule (by a state agency)
Notification Date
7/31/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
electric rates charged to residential, commercial or industrial utility customers
electric rates charged to residential, commercial or industrial utility customers
Action Intended To Affect
Both Legislative Matter and Rule
Notification Date
1/31/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Both Legislative Matter and Rule
Notification Date
1/31/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to Legislation relating to the ability of municipal utilities to collect unpaid utility bills
Development, drafting or introduction of a proposal relating to
Development, drafting or introduction of a proposal relating to Legislation relating to the ability of municipal utilities to collect unpaid utility bills
Development, drafting or introduction of a proposal relating to Legislation relating to the ability of municipal utilities to collect unpaid utility bills
Action Intended To Affect
Legislative Matter
Notification Date
1/25/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/25/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to LRB 0929/1 - Governor review of proposed administrative rules
Development, drafting or introduction of a proposal relating to
Development, drafting or introduction of a proposal relating to LRB 0929/1 - Governor review of proposed administrative rules
Development, drafting or introduction of a proposal relating to LRB 0929/1 - Governor review of proposed administrative rules
Action Intended To Affect
Legislative Matter
Notification Date
1/25/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/25/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Development, drafting or introduction of budget measures impacting municipal budgets
Development, drafting or introduction of budget measures impacting municipal budgets
Action Intended To Affect
Legislative Matter
Notification Date
1/25/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/25/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
development of legislation relating to siting of wind generation
development of legislation relating to siting of wind generation
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Development, drafting or introduction of bills related to energy efficiency.
Development, drafting or introduction of bills related to energy efficiency.
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Development, drafting or introduction of bills related to renewable energy.
Development, drafting or introduction of bills related to renewable energy.
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Development, drafting or introduction of bills related to the Municpal Electric Company statute.
Development, drafting or introduction of bills related to the Municpal Electric Company statute.
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to applications for certificates of public convenience and necessity for certain electric generating facilities (LRB 2152)
Development, drafting or introduction of a proposal relating to
Relating to applications for certificates of public convenience and necessity for certain electric generating facilities (LRB 2152)
Relating to applications for certificates of public convenience and necessity for certain electric generating facilities (LRB 2152)
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
relating to siting of transmission lines, natural gas pipelines, power plants and facilities
relating to siting of transmission lines, natural gas pipelines, power plants and facilities
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
supporting efforts to increase oversight of rail shippers
supporting efforts to increase oversight of rail shippers
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
the state's public benefits program
the state's public benefits program
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Total Lobbying Effort
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total | |
---|---|---|---|---|---|
Total Lobbying Expenditures | 2011 January - June $21,895.00 |
2011 July - December $29,988.95 |
2012 January - June $30,513.51 |
2012 July - December $30,802.50 |
Total $113,199.96 |
Total Hours Communicating | 2011 January - June 43.00 |
2011 July - December 30.50 |
2012 January - June 20.00 |
2012 July - December 11.00 |
Total 104.50 |
Total Hours Other | 2011 January - June 42.00 |
2011 July - December 37.50 |
2012 January - June 23.00 |
2012 July - December 22.50 |
Total 125.00 |
Percent Allocation of Lobbying Effort
Legislative Bills/Resolutions
Relating to: assignment of income, prizes, and earnings to pay a municipal court judgment and prohibiting municipal electric or water utilities from collecting certain utility arrearages from owners of rental properties as property liens.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 10% |
2011 July - December 15% |
2012 January - June 10% |
2012 July - December |
Total 10% |
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 25% |
2011 July - December 60% |
2012 January - June 30% |
2012 July - December |
Total 33% |
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December 15% |
2012 January - June |
2012 July - December |
Total 4% |
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale merchant plants; public utility removal of certain electric service lines; renewable resource credits; tampering or interfering with utility equipment; granting rule-making authority; and providing penalties.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 10% |
2012 July - December |
Total 2% |
Budget Bill Subjects
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 5% |
2011 July - December |
2012 January - June |
2012 July - December |
Total 2% |
Administrative Rulemaking Proceedings
No administrative rulemaking proceedings found.
Topics Not Yet Assigned A Bill Or Rule Number
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 3% |
2011 July - December |
2012 January - June |
2012 July - December |
Total 1% |
Development, drafting or introduction of a proposal relating to Legislation relating to the ability of municipal utilities to collect unpaid utility bills
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 22% |
2011 July - December |
2012 January - June 10% |
2012 July - December 25% |
Total 14% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 25% |
2011 July - December |
2012 January - June |
2012 July - December 25% |
Total 13% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 20% |
2012 July - December |
Total 4% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December 10% |
Total 1% |
Minor Efforts
(Time spent on matters each of which accounted for less than 10% of the organization's lobbying.)
Other Matters
Includes time spent on:
- Gubernatorial nominations
- Matters on which the organization made no lobbying communication