Wisconsin Industrial Energy Group Inc
Registered Principal Details
Business Or Interest:
Large industrial end users of electricity and natural gas.
Lobbying Interests:
Advocacy for large industrial end-users of natural gas and electricity. WIEG lobbies the legislature and intervenes with regulators.
CEO Name:
Anthony J. Karwowski
Exective Director
Large industrial end users of electricity and natural gas.
Lobbying Interests:
Advocacy for large industrial end-users of natural gas and electricity. WIEG lobbies the legislature and intervenes with regulators.
CEO Name:
Anthony J. Karwowski
Exective Director
Contact
TS
Todd Stuart
10 E Doty St Ste 800
Madison, WI 53703
(608) 441-5740
(608) 441-5741
tstuart@wieg.org
www.wieg.org
10 E Doty St Ste 800
Madison, WI 53703
(608) 441-5740
(608) 441-5741
tstuart@wieg.org
www.wieg.org
Authorized Lobbyists
Lobbyist Name | Exclusive Duties | Authorized On | Withdrawn On |
---|
Lobbying Interests
Legislative Bills/Resolutions
Assembly Bill 153
relating to: specifying the rate-making principles applicable to certain electric generating facilities, providing an exemption from emergency rule procedures, and granting rule-making authority.
Bill Text and History
3/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Unless AB 153 is amended with sufficient safeguards to ensure the "least cost" option as the ratemaking principle for new power plants, WIEG is not in support of AB 153 unless these "lease cost" amendments are adopted.
relating to: specifying the rate-making principles applicable to certain electric generating facilities, providing an exemption from emergency rule procedures, and granting rule-making authority.
Bill Text and History
Against
Notification Date3/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Unless AB 153 is amended with sufficient safeguards to ensure the "least cost" option as the ratemaking principle for new power plants, WIEG is not in support of AB 153 unless these "lease cost" amendments are adopted.
Assembly Bill 304
relating to: restrictions on employment of former commissioners and certain staff of the Public Service Commission and providing a penalty.
Bill Text and History
4/13/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
WIEG is in support of AB304 - New Ethics Law for the Public Service Commission of Wisconsin
relating to: restrictions on employment of former commissioners and certain staff of the Public Service Commission and providing a penalty.
Bill Text and History
For
Notification Date4/13/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
WIEG is in support of AB304 - New Ethics Law for the Public Service Commission of Wisconsin
Assembly Bill 841
relating to: administration and funding of programs for utility public benefits; renewable energy requirements for utilities and retail electric cooperatives; energy efficiency requirements for state construction; revising and reviewing the state energy co...
Bill Text and History
12/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Will be monitoring and working with other consumer groups to determine the bills impacts to utility customers. We have not yet taken a position on this bill.
relating to: administration and funding of programs for utility public benefits; renewable energy requirements for utilities and retail electric cooperatives; energy efficiency requirements for state construction; revising and reviewing the state energy co...
Bill Text and History
Other
Notification Date12/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Will be monitoring and working with other consumer groups to determine the bills impacts to utility customers. We have not yet taken a position on this bill.
Senate Bill 79
relating to: specifying the rate-making principles applicable to certain electric generating facilities, providing an exemption from emergency rule procedures, and granting rule-making authority.
Bill Text and History
2005 Wisconsin Act 7
2/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
WIEG and CUB are opposed to SB 79. Our analysis leads us to conclude that we cannot support the bill as drafted because of the likelihood of unnecessary increases in utility rates that Wisconsin ratepayers cannot afford.
relating to: specifying the rate-making principles applicable to certain electric generating facilities, providing an exemption from emergency rule procedures, and granting rule-making authority.
Bill Text and History
2005 Wisconsin Act 7
Against
Notification Date2/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
WIEG and CUB are opposed to SB 79. Our analysis leads us to conclude that we cannot support the bill as drafted because of the likelihood of unnecessary increases in utility rates that Wisconsin ratepayers cannot afford.
Senate Bill 219
relating to: applications for certificates of public convenience and necessity for certain electric generating facilities.
Bill Text and History
1/31/2006
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
relating to: applications for certificates of public convenience and necessity for certain electric generating facilities.
Bill Text and History
Other
Notification Date1/31/2006
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 311
relating to: restrictions on employment of former commissioners and certain staff of the Public Service Commission and providing a penalty.
Bill Text and History
10/31/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Supports the passage of the PSCW Ethics Bill SB 311 and AB 304
relating to: restrictions on employment of former commissioners and certain staff of the Public Service Commission and providing a penalty.
Bill Text and History
For
Notification Date10/31/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Supports the passage of the PSCW Ethics Bill SB 311 and AB 304
Senate Bill 459
relating to: administration and funding of programs for utility public benefits; renewable energy requirements for utilities and retail electric cooperatives; energy efficiency requirements for state construction; revising and reviewing the state energy co...
Bill Text and History
2005 Wisconsin Act 141
1/31/2006
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
relating to: administration and funding of programs for utility public benefits; renewable energy requirements for utilities and retail electric cooperatives; energy efficiency requirements for state construction; revising and reviewing the state energy co...
Bill Text and History
2005 Wisconsin Act 141
Other
Notification Date1/31/2006
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Budget Bill Subjects
Biennial budget bill treatment of matter relating to
Ethics Board
Ethics Board
Notification Date
1/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Similar Ethics Bills AB 958 by Rep. Blacks for the 2003-04 Legisaltive Session
1/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Similar Ethics Bills AB 958 by Rep. Blacks for the 2003-04 Legisaltive Session
Biennial budget bill treatment of matter relating to
Governor
Governor
Notification Date
1/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Governors Task Force On Energy Efficiency and Renewables and PSCW Ethics Legislation
1/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Governors Task Force On Energy Efficiency and Renewables and PSCW Ethics Legislation
Biennial budget bill treatment of matter relating to
Legislature
Legislature
Notification Date
1/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Governors Task Force on Energy Efficiency and Renewables and PSCW Ethics Legislation
1/28/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
Governors Task Force on Energy Efficiency and Renewables and PSCW Ethics Legislation
Biennial budget bill treatment of matter relating to
Public Service Commission: Agencywide
Public Service Commission: Agencywide
Notification Date
5/12/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
WIEG Supports increasing PSCW Staffing Levels
5/12/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Comments
WIEG Supports increasing PSCW Staffing Levels
Administrative Rulemaking Proceedings
Agency Name
Public Service Commission
Subject
PSC 118, changes found in 2005 Wis. Act 141 regarding renewable resource credits.
Scope Statement
Register Number: 604 (4/15/2006)
Clearinghouse Rule: CR 06-112
6/15/2006
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Public Service Commission
Subject
PSC 118, changes found in 2005 Wis. Act 141 regarding renewable resource credits.
Scope Statement
Register Number: 604 (4/15/2006)
Clearinghouse Rule: CR 06-112
Other
Notification Date6/15/2006
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Agency Name
Public Service Commission
Subject
statewide energy efficiency and renewable resource programs.
Scope Statement
Register Number: 604 (4/15/2006)
Clearinghouse Rule: CR 06-139
6/15/2006
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Public Service Commission
Subject
statewide energy efficiency and renewable resource programs.
Scope Statement
Register Number: 604 (4/15/2006)
Clearinghouse Rule: CR 06-139
Other
Notification Date6/15/2006
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Topics Not Yet Assigned A Bill Or Rule Number
LRB-3616/2 Draft Legislation on Energy Efficiency and Renewable Energy. Neither for or against. In the process of reviewing the draft legislation.
Development, drafting or introduction of a proposal relating to
LRB-3616/2 Draft Legislation on Energy Efficiency and Renewable Energy. Neither for or against. In the process of reviewing the draft legislation.
LRB-3616/2 Draft Legislation on Energy Efficiency and Renewable Energy. Neither for or against. In the process of reviewing the draft legislation.
Action Intended To Affect
Legislative Matter
Notification Date
11/11/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
11/11/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Monitor and track Energy Efficiency and Renewable legislation that maybe forth coming.
Monitor and track Energy Efficiency and Renewable legislation that maybe forth coming.
Action Intended To Affect
Legislative Matter
Notification Date
10/31/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/31/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
The appointment of Dan Ebert as Chair of the PSCW
The appointment of Dan Ebert as Chair of the PSCW
Action Intended To Affect
Legislative Matter
Notification Date
10/11/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/11/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Review the draft legislation that would revise the state's energy priorities law to include IGCC technology. No position at this time.
Development, drafting or introduction of a proposal relating to
Review the draft legislation that would revise the state's energy priorities law to include IGCC technology. No position at this time.
Review the draft legislation that would revise the state's energy priorities law to include IGCC technology. No position at this time.
Action Intended To Affect
Legislative Matter
Notification Date
6/21/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
6/21/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
LRB-2152 The bill imposes requirements on the PSC's determination regarding whether an application for a CPCN is complete. WIEG is tracking this bill to better understand the full implications of the proposed legislation.
Development, drafting or introduction of a proposal relating to
LRB-2152 The bill imposes requirements on the PSC's determination regarding whether an application for a CPCN is complete. WIEG is tracking this bill to better understand the full implications of the proposed legislation.
LRB-2152 The bill imposes requirements on the PSC's determination regarding whether an application for a CPCN is complete. WIEG is tracking this bill to better understand the full implications of the proposed legislation.
Action Intended To Affect
Legislative Matter
Notification Date
5/24/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
5/24/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Energy Planning Legislation LRB-1008/2. WIEG is interested in the development of this legislation and will be working with Representative Black on his draft Energy Planning Bill.
Development, drafting or introduction of a proposal relating to
Energy Planning Legislation LRB-1008/2. WIEG is interested in the development of this legislation and will be working with Representative Black on his draft Energy Planning Bill.
Energy Planning Legislation LRB-1008/2. WIEG is interested in the development of this legislation and will be working with Representative Black on his draft Energy Planning Bill.
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Generation Siting,supporting additional incentives (state aid payments)for communities that host new generation facilities
Development, drafting or introduction of a proposal relating to
Generation Siting,supporting additional incentives (state aid payments)for communities that host new generation facilities
Generation Siting,supporting additional incentives (state aid payments)for communities that host new generation facilities
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Governor's Task Force on Energy Efficiency and Renewables
Governor's Task Force on Energy Efficiency and Renewables
Action Intended To Affect
Both Legislative Matter and Rule
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Both Legislative Matter and Rule
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
In support of Representative Black's State Energy Security Act (LRB-1008/4). Legilation will promote least-cost answers to future energy needs for Wisconsin.
Development, drafting or introduction of a proposal relating to
In support of Representative Black's State Energy Security Act (LRB-1008/4). Legilation will promote least-cost answers to future energy needs for Wisconsin.
In support of Representative Black's State Energy Security Act (LRB-1008/4). Legilation will promote least-cost answers to future energy needs for Wisconsin.
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
LRB-4032/2 Proposed Ethics Bill for PSCW by Rep. Black.
LRB-4032/2 Proposed Ethics Bill for PSCW by Rep. Black.
Action Intended To Affect
Legislative Matter
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/1/2005
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Total Lobbying Effort
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total | |
---|---|---|---|---|---|
Total Lobbying Expenditures | 2005 January - June $5,936.89 |
2005 July - December $5,115.94 |
2006 January - June $170.69 |
2006 July - December $341.38 |
Total $11,564.90 |
Total Hours Communicating | 2005 January - June 51.00 |
2005 July - December 47.25 |
2006 January - June 2.00 |
2006 July - December 4.00 |
Total 104.25 |
Total Hours Other | 2005 January - June 0.00 |
2005 July - December 0.00 |
2006 January - June 0.00 |
2006 July - December 0.00 |
Total 0.00 |
Percent Allocation of Lobbying Effort
Legislative Bills/Resolutions
relating to: specifying the rate-making principles applicable to certain electric generating facilities, providing an exemption from emergency rule procedures, and granting rule-making authority.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 5% |
2005 July - December |
2006 January - June |
2006 July - December |
Total 3% |
relating to: specifying the rate-making principles applicable to certain electric generating facilities, providing an exemption from emergency rule procedures, and granting rule-making authority.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 5% |
2005 July - December 1% |
2006 January - June |
2006 July - December |
Total 3% |
relating to: restrictions on employment of former commissioners and certain staff of the Public Service Commission and providing a penalty.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 50% |
2005 July - December 20% |
2006 January - June |
2006 July - December |
Total 34% |
relating to: applications for certificates of public convenience and necessity for certain electric generating facilities.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June |
2005 July - December 2% |
2006 January - June |
2006 July - December |
Total < 1% |
relating to: administration and funding of programs for utility public benefits; renewable energy requirements for utilities and retail electric cooperatives; energy efficiency requirements for state construction; revising and reviewing the state energy conservation code; state use of renewable energy resources; anaerobic digestor research; and granting rule-making authority.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June |
2005 July - December 2% |
2006 January - June |
2006 July - December |
Total < 1% |
relating to: restrictions on employment of former commissioners and certain staff of the Public Service Commission and providing a penalty.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June |
2005 July - December 20% |
2006 January - June |
2006 July - December |
Total 9% |
relating to: administration and funding of programs for utility public benefits; renewable energy requirements for utilities and retail electric cooperatives; energy efficiency requirements for state construction; revising and reviewing the state energy conservation code; state use of renewable energy resources; anaerobic digestor research; and granting rule-making authority.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June |
2005 July - December 20% |
2006 January - June |
2006 July - December |
Total 9% |
Budget Bill Subjects
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 5% |
2005 July - December 1% |
2006 January - June |
2006 July - December |
Total 3% |
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 5% |
2005 July - December 3% |
2006 January - June |
2006 July - December |
Total 4% |
Administrative Rulemaking Proceedings
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June |
2005 July - December |
2006 January - June 100% |
2006 July - December 100% |
Total 6% |
Topics Not Yet Assigned A Bill Or Rule Number
Generation Siting,supporting additional incentives (state aid payments)for communities that host new generation facilities
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 2% |
2005 July - December 2% |
2006 January - June |
2006 July - December |
Total 2% |
Energy Planning Legislation LRB-1008/2. WIEG is interested in the development of this legislation and will be working with Representative Black on his draft Energy Planning Bill.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 2% |
2005 July - December 4% |
2006 January - June |
2006 July - December |
Total 3% |
In support of Representative Black's State Energy Security Act (LRB-1008/4). Legilation will promote least-cost answers to future energy needs for Wisconsin.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 2% |
2005 July - December 2% |
2006 January - June |
2006 July - December |
Total 2% |
LRB-2152 The bill imposes requirements on the PSC's determination regarding whether an application for a CPCN is complete. WIEG is tracking this bill to better understand the full implications of the proposed legislation.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 2% |
2005 July - December |
2006 January - June |
2006 July - December |
Total < 1% |
Review the draft legislation that would revise the state's energy priorities law to include IGCC technology. No position at this time.
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 4% |
2005 July - December 2% |
2006 January - June |
2006 July - December |
Total 3% |
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 8% |
2005 July - December 7% |
2006 January - June |
2006 July - December |
Total 7% |
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June 10% |
2005 July - December 9% |
2006 January - June |
2006 July - December |
Total 9% |
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June |
2005 July - December 1% |
2006 January - June |
2006 July - December |
Total < 1% |
2005 January - June |
2005 July - December |
2006 January - June |
2006 July - December |
Total |
---|---|---|---|---|
2005 January - June |
2005 July - December 2% |
2006 January - June |
2006 July - December |
Total < 1% |
Minor Efforts
No minor efforts found.
Other Matters
Includes time spent on:
- Gubernatorial nominations
- Matters on which the organization made no lobbying communication