Wisconsin Public Service Corporation
Registered Principal Details
Business Or Interest:
Electric and natural gas utility.
Lobbying Interests:
WPS will lobby legislation and administrative rules related to energy, utilities, the environment, taxation and all items that affect its business.
CEO Name:
Charlie Schrock
Assistant Vice President - Government Relations
Electric and natural gas utility.
Lobbying Interests:
WPS will lobby legislation and administrative rules related to energy, utilities, the environment, taxation and all items that affect its business.
CEO Name:
Charlie Schrock
Assistant Vice President - Government Relations
Contact
PS
Patrick Schillinger
PO Box 19001
Green Bay, WI 54307-9001
(920) 433-1511
(920) 433-5741
pschillinger@integrysgroup.com
PO Box 19001
Green Bay, WI 54307-9001
(920) 433-1511
(920) 433-5741
pschillinger@integrysgroup.com
Authorized Lobbyists
Lobbyist Name | Exclusive Duties | Authorized On | Withdrawn On |
---|---|---|---|
Patrick Schillinger | Exclusive Duties N/A | Authorized On 1/1/2011 | Withdrawn On N/A |
Ronald Antonneau | Exclusive Duties N/A | Authorized On 1/1/2011 | Withdrawn On N/A |
Ray Carey | Exclusive Duties N/A | Authorized On 1/1/2011 | Withdrawn On N/A |
Kathleen Walby | Exclusive Duties N/A | Authorized On 1/1/2011 | Withdrawn On N/A |
Mark Graul | Exclusive Duties N/A | Authorized On 1/1/2011 | Withdrawn On N/A |
Jason Childress | Exclusive Duties N/A | Authorized On 1/1/2011 | Withdrawn On N/A |
Phillip Uekert | Exclusive Duties N/A | Authorized On 1/1/2011 | Withdrawn On 8/11/2011 |
Kristin Ruesch | Exclusive Duties N/A | Authorized On 1/1/2011 | Withdrawn On 9/9/2011 |
Sean Stephenson | Exclusive Duties N/A | Authorized On 10/11/2011 | Withdrawn On N/A |
Christopher LaRowe | Exclusive Duties N/A | Authorized On 1/19/2012 | Withdrawn On N/A |
Lobbying Interests
Legislative Bills/Resolutions
Assembly Bill 61
Relating to: creating an income and franchise tax credit for constructing and operating a data center that is designed for maximum energy efficiency and minimum environmental impact and providing an exemption from rule-making procedures.
Bill Text and History
2/9/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: creating an income and franchise tax credit for constructing and operating a data center that is designed for maximum energy efficiency and minimum environmental impact and providing an exemption from rule-making procedures.
Bill Text and History
For
Notification Date2/9/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 114
Relating to: eligibility of hydroelectric resources under the renewable portfolio standard.
Bill Text and History
4/29/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: eligibility of hydroelectric resources under the renewable portfolio standard.
Bill Text and History
For
Notification Date4/29/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 145
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
Bill Text and History
10/6/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
Bill Text and History
None
Notification Date10/6/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 146
Relating to: use of renewable resource credits to comply with renewable portfolio standards.
Bill Text and History
11/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: use of renewable resource credits to comply with renewable portfolio standards.
Bill Text and History
Other
Notification Date11/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 229
Relating to: repealing a prohibition on certain nonessential uses of natural gas.
Bill Text and History
2011 Wisconsin Act 154
1/23/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: repealing a prohibition on certain nonessential uses of natural gas.
Bill Text and History
2011 Wisconsin Act 154
For
Notification Date1/23/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 309
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
Bill Text and History
10/11/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
Bill Text and History
Against
Notification Date10/11/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 383
Relating to: the disposal of oil absorbent materials.
Bill Text and History
2011 Wisconsin Act 152
1/4/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: the disposal of oil absorbent materials.
Bill Text and History
2011 Wisconsin Act 152
For
Notification Date1/4/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 426
Relating to: regulation of ferrous metallic mining and related activities, making an appropriation, and providing penalties.
Bill Text and History
1/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: regulation of ferrous metallic mining and related activities, making an appropriation, and providing penalties.
Bill Text and History
For
Notification Date1/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 527
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale mercha...
Bill Text and History
2/6/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale mercha...
Bill Text and History
For
Notification Date2/6/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 586
Relating to: professional land surveyors; the practice of professional land surveying; surveying land abutting navigable waters; various changes regarding platting, surveying, and certified survey maps; and granting rule-making authority.
Bill Text and History
3/13/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: professional land surveyors; the practice of professional land surveying; surveying land abutting navigable waters; various changes regarding platting, surveying, and certified survey maps; and granting rule-making authority.
Bill Text and History
Other
Notification Date3/13/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Assembly Bill 627
Relating to: trading of water pollution credits, granting rule-making authority, and making an appropriation.
Bill Text and History
3/2/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: trading of water pollution credits, granting rule-making authority, and making an appropriation.
Bill Text and History
Other
Notification Date3/2/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 31
Relating to: creating an income and franchise tax credit for constructing and operating a data center that is designed for maximum energy efficiency and minimum environmental impact and providing an exemption from rule-making procedures.
Bill Text and History
2/9/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: creating an income and franchise tax credit for constructing and operating a data center that is designed for maximum energy efficiency and minimum environmental impact and providing an exemption from rule-making procedures.
Bill Text and History
For
Notification Date2/9/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 58
Relating to: liability of public utility customers for unbilled utility service.
Bill Text and History
4/12/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: liability of public utility customers for unbilled utility service.
Bill Text and History
Against
Notification Date4/12/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 81
Relating to: eligibility of hydroelectric resources under the renewable portfolio standard.
Bill Text and History
2011 Wisconsin Act 34
4/30/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: eligibility of hydroelectric resources under the renewable portfolio standard.
Bill Text and History
2011 Wisconsin Act 34
For
Notification Date4/30/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 102
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
Bill Text and History
10/19/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
Bill Text and History
For
Notification Date10/19/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 216
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
Bill Text and History
10/11/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
Bill Text and History
Against
Notification Date10/11/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 266
Relating to: the disposal of oil absorbent materials.
Bill Text and History
2/1/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: the disposal of oil absorbent materials.
Bill Text and History
For
Notification Date2/1/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 428
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale mercha...
Bill Text and History
2011 Wisconsin Act 155
2/7/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale mercha...
Bill Text and History
2011 Wisconsin Act 155
For
Notification Date2/7/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Senate Bill 444
Relating to: professional land surveyors; the practice of professional land surveying; surveying land abutting navigable waters; various changes regarding platting, surveying, and certified survey maps; and granting rule-making authority.
Bill Text and History
2/9/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Relating to: professional land surveyors; the practice of professional land surveying; surveying land abutting navigable waters; various changes regarding platting, surveying, and certified survey maps; and granting rule-making authority.
Bill Text and History
Other
Notification Date2/9/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Topics Not Yet Assigned A Bill Or Rule Number
Development, drafting or introduction of a proposal relating to
Data Center Tax Incentives
Data Center Tax Incentives
Action Intended To Affect
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Development, drafting or introduction of a proposal relating to
Data Center Tax Incentives
Data Center Tax Incentives
Action Intended To Affect
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Distributed Generation
Distributed Generation
Action Intended To Affect
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Development, drafting or introduction of a proposal relating to
Distributed Generation
Distributed Generation
Action Intended To Affect
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Environmental Trust Financing
Environmental Trust Financing
Action Intended To Affect
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Development, drafting or introduction of a proposal relating to
Environmental Trust Financing
Environmental Trust Financing
Action Intended To Affect
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Production Tax Credit
Production Tax Credit
Action Intended To Affect
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Development, drafting or introduction of a proposal relating to
Production Tax Credit
Production Tax Credit
Action Intended To Affect
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Renewable Portfolio Standard
Renewable Portfolio Standard
Action Intended To Affect
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Development, drafting or introduction of a proposal relating to
Renewable Portfolio Standard
Renewable Portfolio Standard
Action Intended To Affect
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Utility billing
Utility billing
Action Intended To Affect
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Legislative matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal do not intend to communicate on this matter.
Development, drafting or introduction of a proposal relating to
Utility Billing
Utility Billing
Action Intended To Affect
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/24/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
The updating, reforming, and streamlining of certain PSC regulatory processes.
The updating, reforming, and streamlining of certain PSC regulatory processes.
Action Intended To Affect
Legislative Matter
Notification Date
1/27/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/27/2012
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Changes to renewable energy credits
Changes to renewable energy credits
Action Intended To Affect
Legislative Matter
Notification Date
11/21/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
11/21/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Modifying renewable resource credits, creating a preference in state procurement for Wisconsin-based businesses
Development, drafting or introduction of a proposal relating to
Modifying renewable resource credits, creating a preference in state procurement for Wisconsin-based businesses
Modifying renewable resource credits, creating a preference in state procurement for Wisconsin-based businesses
Action Intended To Affect
Legislative Matter
Notification Date
10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
10/14/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Relating to authorizing the PSC to approve temporary electric rates to promote economic development
Relating to authorizing the PSC to approve temporary electric rates to promote economic development
Action Intended To Affect
Legislative Matter
Notification Date
5/13/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
5/13/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Legislation related to sustainable energy and RPS matters
Legislation related to sustainable energy and RPS matters
Action Intended To Affect
Legislative Matter
Notification Date
1/21/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Legislative Matter
Notification Date
1/21/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Development, drafting or introduction of a proposal relating to
Efforts to reduce greenhouse gas emissions
Efforts to reduce greenhouse gas emissions
Action Intended To Affect
Both Legislative Matter and Rule
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Both Legislative Matter and Rule
Notification Date
1/1/2011
First Communication Date
N/A
Communication Information
The principal, a lobbyist authorized by the principal, or another individual acting on behalf of the principal has not yet communicated on this matter, but intends to do so at a later date.
Total Lobbying Effort
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total | |
---|---|---|---|---|---|
Total Lobbying Expenditures | 2011 January - June $76,617.80 |
2011 July - December $59,921.19 |
2012 January - June $67,195.78 |
2012 July - December $66,411.96 |
Total $270,146.73 |
Total Hours Communicating | 2011 January - June 112.75 |
2011 July - December 16.20 |
2012 January - June 38.05 |
2012 July - December 16.60 |
Total 183.60 |
Total Hours Other | 2011 January - June 275.45 |
2011 July - December 46.75 |
2012 January - June 67.65 |
2012 July - December 39.80 |
Total 429.65 |
Percent Allocation of Lobbying Effort
Legislative Bills/Resolutions
Relating to: liability of public utility customers for unbilled utility service.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 5% |
2011 July - December 27% |
2012 January - June 22% |
2012 July - December |
Total 10% |
Relating to: eligibility of hydroelectric resources under the renewable portfolio standard.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 38% |
2011 July - December 26% |
2012 January - June |
2012 July - December |
Total 27% |
Relating to: eligibility of hydroelectric resources under the renewable portfolio standard.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 45% |
2011 July - December |
2012 January - June |
2012 July - December |
Total 29% |
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December 1% |
2012 January - June 1% |
2012 July - December |
Total < 1% |
Relating to: use of renewable resource credits to comply with renewable portfolio standards.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December 11% |
2012 January - June 2% |
2012 July - December |
Total 1% |
Relating to: authorizing the Public Service Commission to approve temporary electric rates to promote economic development.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December 24% |
2012 January - June |
2012 July - December |
Total 2% |
Relating to: dry cask storage of spent fuel from nuclear power plants and granting rule-making authority.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 2% |
2012 July - December |
Total < 1% |
Relating to: professional land surveyors; the practice of professional land surveying; surveying land abutting navigable waters; various changes regarding platting, surveying, and certified survey maps; and granting rule-making authority.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 2% |
2012 July - December |
Total < 1% |
Relating to: the disposal of oil absorbent materials.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 3% |
2012 July - December |
Total < 1% |
Relating to: repealing a prohibition on certain nonessential uses of natural gas.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 5% |
2012 July - December |
Total < 1% |
Relating to: the disposal of oil absorbent materials.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 8% |
2012 July - December |
Total 1% |
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale merchant plants; public utility removal of certain electric service lines; renewable resource credits; tampering or interfering with utility equipment; granting rule-making authority; and providing penalties.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 21% |
2012 July - December |
Total 4% |
Relating to: commissioners of the Public Service Commission; notices, orders, and determinations of the commission; certificates of authority issued by the commission; approval of contracts by the commission; electricity sales from certain wholesale merchant plants; public utility removal of certain electric service lines; renewable resource credits; tampering or interfering with utility equipment; granting rule-making authority; and providing penalties.
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June 31% |
2012 July - December |
Total 5% |
Budget Bill Subjects
No budget bill subjects found.
Administrative Rulemaking Proceedings
No administrative rulemaking proceedings found.
Topics Not Yet Assigned A Bill Or Rule Number
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 1% |
2011 July - December |
2012 January - June |
2012 July - December |
Total < 1% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June 8% |
2011 July - December |
2012 January - June |
2012 July - December |
Total 5% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December 2% |
Total < 1% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December 4% |
Total < 1% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December 18% |
Total 2% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December 28% |
Total 3% |
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December |
Total |
---|---|---|---|---|
2011 January - June |
2011 July - December |
2012 January - June |
2012 July - December 46% |
Total 4% |
Minor Efforts
(Time spent on matters each of which accounted for less than 10% of the organization's lobbying.)
Other Matters
No other matters found.